Feel free to contact us:
+880 1322823968
xuantongbd@gmail.com
Saturday - Thursday, 8:30 AM to 5:30 PM

Clean Room Design

A cleanroom is a controlled environment system where pollutants like dust, airborne microbes, and aerosol particles are filtered out in order to provide the cleanest area possible. Clean room Service plays a vital role in maintaining the desired cleanliness, temperature, humidity, pressure control, and air quality levels required for the specific clean room application. Xuan-Tong (BD) Co., Ltd. can design a clean room system for you as per the ISO Guidelines and industry standard, based on your special requirements.

By offering a wide range of specialized products and equipment, Clean Room Service ensures optimal cleanliness, safety, and efficiency across various industries, chemical industries, optical industries, including pharmaceuticals, electronics, healthcare, IT room, data center room, and research laboratories.

XTBD also has optimistic, economical, and customizable design, installation, and maintenance services as per client’s requirements.

Clean room services encompass various key functions that are essential for the proper operation, maintenance, and management of clean room environments. Here are some key functions typically associated with clean room services:

  • Cleaning and Disinfection
  • Contamination Control
  • Airflow and Environmental Monitoring
  • Filter Replacement and Maintenance
  • Equipment and System Maintenance
  • Training and Documentation
  • Emergency Response and Contingency Planning

Clean Room Ceiling

  • Ceiling, T-Grid
  • HEPA (High Efficiency Particulate Air Filter)
  • ULPA (Ultra Low Particulate Air)
  • FFU (Fan Filter Unit)
  • SUS Ceiling

Clean Room Floor

  • Raised Floor
  • PVC Tile
  • ESD Tile
  • Epoxy Floor
  • SUS Floor

Clean Room Partition

  • Sandwiched Wall
  • RC Wall with Epoxy Coating
  • SUS Wall

C/R Facility System

  • MAU/AHU
  • CHW System
  • Lighting System
  • Fire Fitting System
  • VESDA System
  • FCU (Fan Coil Unit)
  • DCU (Dry Coil Unit)
  • DCC (Dry Cooling Coil)
  • PCW (Process Cooling Water System)
  • Others

Clean Room Classification Standard

We have expertise and professional technicians with licenses who can assist the client & test their Germ-Free clean room environment. To get the relative certification and validation.

Clean Room Estimate of Construction Period

Take a 50 m2 clean room as an example (various kinds of paperwork are excluded):

  • Material preparing─about 20~30 working days.
  • Construction─about 25 working days (partition, ventilation, power panel, sockets, lights, switches, ground, automatic control and fire extinguishing equipment are included).
  • Finish testing─about 3~5 working days (cleaning, testing, validation test are included).
  • We can build up the clean room in around 50 working days!

Other factors:

  • Field factors such as a field with too much angle, the height is not enough, the earlier settlement occupied (ex: wire, pipe, fan, …), …etc. – plus 5~20 working days.
  • Water supply system – plus 3 working days (Equipment installation and piping are included)
  • Drain system – plus 5 working days (Masonry work and piping are included)
  • Pure water system – plus 3 working days (Equipment installation and piping are included)
  • Compressed air system – plus 3 working days (Equipment installation and piping are included)
  • Special gas line – plus3 working days (Equipment installation and piping are included).
  • Air exhausting system (general, ozone, organic, or acid-base gas) – plus 3 working days (Equipment install and piping are included)
  • Monitor system – plus 3 working days (Equipment install and wiring are included)
Don’t hesitate to give us a call or send us an email.

Our dedicated team is ready to assist you to discuss your project requirements, seek advice, or request a detailed proposal.